1. Push B to close to the tunnel. 2. Pull A across the oval track and then push it to the lower track. 3. Push B to the oval track between the two straight rails. 4. Pull A out of the straight rail and push it to behind B and then push them (AB) together to the top side of the oval track. 5. Go to the other side and push BA to the upper straight rail. 6. Pull B back to close to tunnel. 7. Go across the tunnel and then pull A out of the upper rail and push it to B's oringinal position. 8. Pull B to A's oringinal position. 9. Go back to top rail. |
欢迎光临 珍珠湾ART (http://zzwav.com/) | Powered by Discuz! X3 |